Eugene Field Elementary
Originally built in 1922, Eugene Field Elementary School was entirely rebuilt in 2005 thanks to the support of Tulsa voters.
At Eugene Field Elementary School, the 2021 Bond for Tulsa Public Schools includes:
- Front entry remodel and a new playground structure;
- A digital marquee, and parking lot and lighting improvements;
- New educational and instructional technology for every class;
- New equipment, materials, and resources for fine arts and physical education; and
- Safe, comfortable, and environmentally sustainable transportation.
PROPOSITION 1: SAFE LEARNING |
- Security cameras and radios
- Safe entry and door access control
- Parking lot, sidewalk, and exterior LED lighting
- Furniture
- Renovations and Building Repairs
PROPOSITION 2: STUDENT AND CLASSROOM TECHNOLOGY |
- Network and systems upgrades
- Student and teacher technology
- Digital marquee
PROPOSITION 3: TRANSPORTATION |
Funding from Proposition 3 will ensure that all students have access to safe, comfortable, and dependable transportation.
PROPOSITION 4: QUALITY LEARNING MATERIALS AND PROGRAMS |
- Textbooks and learning materials
- Library digital and print resources
- School projects funds
- Wellness and physical education